Does the system have to be installed by an MCS certified installer?
Yes, the Microgeneration Certification Scheme (MCS) must be used for smaller systems:
Any system under 50kW (electrical) or 45kW (thermal) must be installed by an MCS-accredited installer to be eligible for the tariffs.
One of the requirements which the installer will have to meet is to ensure that major items of renewable energy equipment are also MCS-certified.
Share It on :