How do they define the installation date?
The consultation document says “installation completed”. We believe this should therefore be the latest date that the installation was installed and commissioned
In the case of grid-connected electrical systems it could reasonably be the date it first delivered power to the grid.
In the case of systems registered for the Renewables Obligation, assume that installation must have been completed by the date of RO accreditation.
Share It on :